Auxiliary equipment & integrated systems
e-mail [email protected] Language EN ES
Testing & inspection

Testing & Inspection

What is checked on every machine before shipment, which tests are arranged in advance, and the evidence you receive before the balance payment.

Placeholder image: testing-area panorama photo, 2400 × 1030 px (240:103). It shows the space reserved for approved material and is not a photograph of our equipment.
Placeholder · 2400 × 1030 px (240:103)(占位图) Replace with an approved testing-area panorama photo at this size.(按此尺寸替换为正式图片。)

The default check

Every machine runs before it ships.

Power-on and a period of unloaded running in our factory are part of every delivery, whatever the machine and whatever the order size. The run verifies the machine against the documents you confirmed — the PI, the contract and the drawings — not against a generic checklist.

You do not need to be present for the run. It is documented with photos and a running video, and anything beyond it — your material, a longer run, an outside inspector — is arranged as its own step, described below.

Standard factory check
Power-on and a period of no-load running. No single test duration is stated for every machine.
Placeholder image: power-on test photo, 1200 × 900 px (4:3). It shows the space reserved for approved material and is not a photograph of our equipment.
Placeholder · 1200 × 900 px (4:3)(占位图) Replace with an approved power-on test photo at this size.(按此尺寸替换为正式图片。)

What the standard check covers

  • Final configuration

    Checked against the confirmed PI and drawings.

  • Voltage and frequency

    Against the electrical specification in the order.

  • Nameplate

    Machine data as ordered.

  • Appearance and finish
  • Main components

    Brands and models as specified.

  • Accessories and spare parts

    Against the packing list.

  • Basic functions
Placeholder image: nameplate and electrical check photo, 1200 × 900 px (4:3). It shows the space reserved for approved material and is not a photograph of our equipment.
Placeholder · 1200 × 900 px (4:3)(占位图) Replace with an approved nameplate and electrical check photo at this size.(按此尺寸替换为正式图片。)

Arranged in advance

Beyond the standard check, agreed first.

Raise it during the quotation or before production ends. The conditions and the cost are confirmed in writing; then the test runs before shipment.

These tests are real options, not sales wording. What turns an option into a plan is a written confirmation of its conditions and cost — after that, the agreed acceptance becomes part of the order and runs before the shipment stage.

Arranged in advance
Material test runs, third-party inspection or testing are discussed in advance and the cost is confirmed before they are carried out.

Quantified performance promises enter the order documents only when the test material, running conditions, method, duration, measurement and acceptance figures are fixed in writing.

  • Material test runs

    Your actual material, arranged before production ends.

  • Continuous running

    A longer run under conditions agreed in advance.

  • Performance verification

    Capacity, temperature, moisture content, mixing uniformity or VOC.

  • Outside inspection & testing

    An outside inspector witnesses the factory tests, or an independent laboratory tests the machine or samples.

Placeholder image: material test-run photo, 1200 × 900 px (4:3). It shows the space reserved for approved material and is not a photograph of our equipment.
Placeholder · 1200 × 900 px (4:3)(占位图) Replace with an approved material test-run photo at this size.(按此尺寸替换为正式图片。)

Evidence and release

Photos and video, then shipment.

After production you receive photos of the finished machine and a video of the test run. Where a third-party inspection or a special test was agreed, that acceptance is completed first. The machine is released to packing and shipment once you have confirmed and the bank has actually received the agreed pre-shipment payment.

  • Photos of the finished machine

    Taken when production is completed.

  • Running video

    The test run, provided before the shipment payment stage.

  • Agreed acceptance first

    Third-party inspections and special tests run before release.

Next step

Request a Quote

Tell us the material, the process and what you need to achieve. Technical details can be completed later together with our sales team.

Request a Quote
Request a Quote